⏰DepoDay
← All guides
Deductions

Charging for Your Own Labor on Deposit Deductions

5 min read · Updated 2026-11-29

Yes, you can charge for repairs and cleaning you or your employees do yourselves, at a reasonable rate for the actual time spent. Several states require the statement to show the hours and the hourly rate, plus receipts for materials. The charge has to reflect real work on tenant damage, not a markup and not time you would have spent on routine turnover anyway.

Key takeaways

  • Your own labor is a legitimate cost when it repairs tenant damage or cleaning beyond normal use.
  • California and Washington require time spent and hourly rate on the statement; Oregon requires a reasonable hourly rate.
  • Keep a time log and materials receipts the same day you do the work.
  • Use a rate you can defend with local quotes, and never bill more hours than the job took.

What the states require

WhereRule for landlord or employee labor
CaliforniaA description of the work, the time spent and the reasonable hourly rate, plus copies of bills or receipts for materials (Cal. Civ. Code § 1950.5)
WashingtonBills or receipts for materials (a vendor price list is acceptable for stock on hand), plus the time spent and the hourly rate (RCW 59.18.280(1)(b))
OregonLabor must be at a reasonable hourly rate (ORS 90.300)
Portland, OregonLabor charges over $200 need documentation showing they are reasonable and in line with typical hourly rates in the metro area (Portland City Code § 30.01.087)
IllinoisThe landlord's own labor may be charged at a reasonable cost (765 ILCS 710/1)
Chicago and suburban Cook CountyWhen the landlord's employees do the work, a certification of actual costs instead of paid receipts
MassachusettsThe sworn list must come with written evidence of the actual or estimated cost, so keep a clear record of your labor (M.G.L. c. 186, § 15B)

In states without a specific rule, the general standard still applies: deductions must be reasonable, and in many states the landlord carries the burden of proof. Texas, for example, requires the landlord to prove that any amount kept was reasonable (Tex. Prop. Code § 92.109(c)). Your time log is that proof.

California has one more wrinkle: if repair and cleaning deductions total $125 or less, the documents do not have to go with the statement, but the tenant can request them within 14 days. See /security-deposit-law/california.

Setting a reasonable rate

No state statute we reviewed sets a dollar rate for landlord labor. "Reasonable" generally means close to what you would have paid someone in your area for the same work. Practical ways to support your number:

  • Get two or three quotes from local handymen or cleaners for similar jobs, and save them.
  • Match the trade. Basic cleaning, painting and drywall patching are priced differently from licensed electrical or plumbing work. If the work needed a license you do not have, hire it out.
  • Use one rate list for all your units and tenants, written down before move-outs happen.
  • Charge less than a contractor if you like, but not more. A contractor's rate includes overhead, insurance and travel you may not have.

Portland's rule ties the rate to typical metro-area hourly rates, and that is a sensible benchmark anywhere.

What counts as time

Charge for the time the tenant's damage actually added:

  • Yes: patching and painting the damaged wall, repairing the broken door, cleaning the oven the tenant left caked with grease.
  • No: your routine turnover walk-through, time spent showing the unit, or repainting that was due anyway because of age.
  • Careful: trips to the hardware store and travel to the unit. If you charge for them at all, keep them modest and record them separately so the tenant can see them.

Pro-rate replaced items by age as you would for a contractor's bill. Labor to install new carpet in place of a worn-out one is not fully chargeable just because you did it yourself. Carpet and Paint Deductions explains the pro-rating.

A time log that holds up

Fill it in the day of the work. A simple table works:

DateTaskStartEndHours
10/03/2026Patch 3 drywall holes, bedroom 29:0010:301.5
10/03/2026Prime and paint patched wall1:002:001.0
10/04/2026Second coat, clean up9:009:300.5

Add before and after photos and the materials receipts. If an employee did the work, have them sign the log.

A worked example

A Washington landlord did the drywall work above after a tenant moved out on September 30, 2026, leaving a $1,500 deposit. The landlord's rate list, based on two local handyman quotes, is $45 an hour for drywall and paint.

LineCalculationAmount
Labor, drywall patch and paint3.0 hours × $45$135.00
Materials: joint compound, patch kit, primerHardware store receipt$23.40
Paint: 1 quart from stock on handVendor price list$18.99
Total for this item$177.39

Washington's 30-day statement must be a full and specific statement of the basis for each deduction. The landlord's line read: "Bedroom 2, three holes in drywall (photos 4 to 6). Patched, primed and painted by owner: 3.0 hours at $45 per hour, materials per attached receipt and price list." The refund was $1,500 minus $177.39, or $1,322.61. The deduction letter builder has room for the hours and rate on each line.

For the documentation rules beyond labor, see When You Need Receipts or Estimates for Deposit Deductions. For what may be charged at all, see What Can a Landlord Deduct From a Security Deposit?.

Common mistakes

  1. Charging a round number like "$300 labor" with no hours or rate.
  2. Billing a full day for a two-hour job.
  3. Using a licensed-trade rate for basic cleaning.
  4. Charging labor for work that fixed normal wear, like a routine full repaint after five years.
  5. Writing the log weeks later from memory.
  6. Charging your own labor for a job a contractor also billed.

FAQ

Can I charge my contractor's rate even though I did the work myself?

You can charge a reasonable rate, which may be close to what a local handyman would charge for the same task. Be ready to show quotes that support it. Charging more than the market would be hard to defend, and in Portland labor over $200 must be documented as in line with typical metro rates.

Can a property manager charge its maintenance staff's time?

Yes, at a reasonable rate for the time spent. California and Washington treat employee work like landlord work: show the time and the hourly rate. Chicago and suburban Cook County accept a certification of actual costs for employee work.

What if the tenant says the rate is too high?

Send your time log, photos and the quotes behind your rate. If you cannot support it, consider adjusting the charge. A reasonable compromise is usually cheaper than a dispute, and some states penalize landlords who keep more than they can justify.

Keep reading